Some of the completed projects
Holy International Ltd
Construction of a 3,000 m², two-story logistics center, including conventional and precast construction on the first floor, lightweight steel construction on the second floor, and all systems, finishes, and site development — delivered up to Form 4
Sasa Cosmetics Ltd
Construction of the 3,500 m² Sasa Cosmetics factory, including concrete and structural works, all building systems, site development, 2,500 m² of floor coating, and 500 m² of office space — delivered up to handover with Form 4 (occupancy permit).
Apollo Power finishing works
Execution of finishing works in an existing factory, including the construction of heavy-steel mezzanines and 1,200 m² of new office space, along with system integration and space upgrades — delivered to full completion.
Estilon Factory
Estilon Factory Execution of development and infrastructure works (Phase A), followed by construction of the 4,000 m² Estilon Automation building — including structure, steel works, systems, and offices — delivered with Form 4.
Medisim Building Ltd
Construction of a 2,800 m², two-story office and light-industrial building for medical device manufacturing, including a combined conventional and precast structural system, all building systems, finishing works, and site development — delivered up to Form 4